News Article
A Message from Steve, CEO
We want to express our appreciation for our valued customers and the dedicated team members who continue to make Neundorfer a success in our industry.
An electrostatic precipitator (ESP) plays a crucial role in maintaining air quality and reducing pollution. To ensure its optimal performance and longevity, regular inspections are essential. Whether conducted as routine maintenance or to troubleshoot specific issues, a well-executed inspection can identify problem areas and streamline maintenance efforts. This article outlines best practices for conducting effective ESP inspections, whether you are performing them in-house or hiring a contractor.
Internal inspections of Electrostatic Precipitator’s (ESP) are a necessary part of maintaining the œmechanical portion of the electrical to obtain maximum performance. In some instances, when performance is deemed acceptable prior to a scheduled outage, inspections often overlook specific internal areas that can detract from collection efficiency during the next on-line period of the ESP. Detailed internal inspections are required to properly schedule current and future maintenance and as a prelude to failures. The following are recommendations, generic in nature, for the conduction of an inspection that will œtime freeze the condition of the internal ESP components.
CAUTION “ Inspections should only be accomplished under the direction of personnel familiar with all Electrostatic Precipitator Safety procedures. It is important that proper grounding procedures and removal of all sources of power be accomplished prior to entering the Precipitator. LETHAL VOLTAGES CAN BE PRESENT AND CAN LEAD TO DEATH BY ELECTROCUTION IF THE PROPER PROCEDURES ARE NOT FOLLOWED. Hot dust may be present on the interior surface of the ESP. These dust deposits may be cool on the surface, but the interior of the deposit may retain sufficient heat to cause SEVERE BURNS ESPECIALLY WHEN OPENING HOPPER DOORS. CONSULT YOUR PLANT’S SAFETY MANUAL FOR PROPER PROCEDURES. Neundorfer, Inc. is not responsible for any damages or injury as the result of this document and the use of the document is at the sole risk of the USER and NOT Neundorfer, Inc.
The purpose of the Dirty Inspection is to examine dust deposits on the ESP internals. It becomes a guide for determining the effectiveness of the Rapping System, Flue Gas Conditioning System (if equipped), Gas Flow Distribution and unusual build-up’s, etc. Dust deposits not compacted by the ESP electrical forces are often quite fragile so minimum disturbance is recommended.
Prior to an outage, be sure to record a set of benchmark T/R readings, and particularly for a major outage, a set of V/I curves as well. Then, plan to run a set of post-outage readings, once the unit is up and running normally, for comparison.
By recording T/R readings even for short outages, you will be able to see potential areas that need attention during this outage or the next one. You may also be able to address an issue that could have caused you to reduce process production if left unattended.
The V/I curves provide a benchmark of clearance issues in the box and show which T/R’s are functioning properly versus those that need to be addressed. V/I curves will also help show the effects of other performance factors such as coal and temperature changes.
Get started working with Neundorfer today & see how we can assist your company.
Notifications