Skip to content
Neundorfer 50 Year Anniversary Logo
Home Resources Maximize Recovery Boiler ESP Efficiency

Maximize Recovery Boiler ESP Efficiency

https://www.neundorfer-v2.vfdevserver.com/wp-content/uploads/2024/05/e3c0dfada197163888d3cd4719c73633-1.jpeg

Recover Boiler ESP operators face a unique set of challenges. Learn how to mitigate these and maximize efficiency.

Is Your Recovery Boiler Complying with Opacity Limits Efficiently?

Electrostatic Precipitators (ESPs) have the propensity to be not so forgiving, with overall performance degrading potentially degrading if all of its processes aren’t functioning optimally. ESPs on recovery boilers can be even more difficult to manage due to more acidic flue gas and higher moisture content. Learn how to mitigate some of the unique challenges faced when operating a recovery boiler ESP to maximize efficiency and maintain emissions & opacity limit compliance.

Learning Objectives

  • Understand the unique challenges faced when operating a recovery boiler ESP
  • Learn what the 3 most common recovery boiler ESP issues are
  • Understand the basics of maximizing recovery boiler ESP performance

Maximize Recovery Boiler ESP Efficiency

May 30, 2024 5:00 PM – May 31, 2024 5:45 PM EDT
Watch On Demand

Speaker Bios

https://www.neundorfer-v2.vfdevserver.com/wp-content/uploads/2020/09/Steve_Headshot.jpg

Steve Ostanek

President & Owner | Neundorfer

Steve has been working with customers for over 30 years to improve plant performance through consulting, training, and strategic planning. Steve is passionate about making a positive impact on people and organizations by getting them to think about things differently, allowing them to see the unseen possibilities in themselves and the world around them.

Links

Watch on Demand

May 30, 2024 5:00 PM – May 31, 2024 5:45 PM EDT
Watch Now

From Our Optimized Insights

Latest Insights

  • News Article

    A Message from Steve, CEO

    We want to express our appreciation for our valued customers and the dedicated team members who continue to make Neundorfer a success in our industry.

  • Case Study

    Major Steel Producer Improves ESP Performance with Neundorfer without any Shutdown Days

    A large, integrated steel producer wanted to reduce the unplanned production stops on their BOF– a result of issues with their ESP. Neundorfer provided an integrated solution that was implemented while maintaining consistent production!

  • News Article

    POS Updates & Releases

    An upcoming feature will introduce a new button to the Utilities screen, which will allow the user to generate a history snapshot file with a single click.